Summary
The
function of grid-tie controller is transfer the
three phases AC to DC generated from wind
turbine, then provides electricity for DC
equipments.
This type of controller is easy to operate, it
can dump load automatically when the wind speed
is out of control and over voltage. If the DC
Voltage is still higher than required voltage
after dump load 30%, controller will stop wind
turbine automatically. The wind turbine will
begin to work after brake time of 12-20minutes.
Besides, this type of controller also has the
advantage of deleting the delay brake time if
you want to make the wind turbine work
immediately after brake, manual brake, the
indication of wind power, unload, over voltage
stop, etc. And this system is very safe and
stable, and has high efficiency and long
lifetime.
Operation
This
controller should be operated by professional
according to the following steps:
1.
Firstly, all switches should be OFF, and the
fuse is disconnected. It should be assemble the
wire when the wind generator is brake and grid
net is cut.
2.
Connected the dump load equipment with
controller a, b, c, separately, then connected
the wind generator with controller A, B, C,
separately. Connected the grid-tie inverter with
the controller output DC480V “+”, “—”.
Connected the grid net AC230V with controller
grid net AC “L”, “N”.
3.
Connected the earthing ware with the controller
earthing ware. Connected the dump load equipment
earthing ware with grounding wire. And this
connect should be firm.
4.
After all connection, it should be check them
carefully. And then start to open according to
the following steps:
A.
Connected the fuse, and the connection is
ok.
B.
Set the grid-tie switch AC “ON”
C. Set the brake switch of wind generator
“ON”
Attention
1.
The voltage of controller is grid net
230V. During the operation, if the grid net is
stop, the controller will also stop, and the
wind turbine will brake.
2.
During
the operation, if the output voltage is higher
than DC480V, the wind turbine will brake. Please
check the reason of over voltage. During the
checking, please set wind turbine brake by
manual switch. After check everything is ok, run
the wind turbine.
3.
The
dump load equipment will be hot when works,
please make sure the surrounding is ventilate
and hard to touch. In addition, it’s forbid that
put something on the surface of it. And it’s
also forbid to use if the surrounding is easy to
fire or explode. Be careful to the spark.
4.
If
you want to connect or dismantle the inverter,
or tidy the branch voltage output wire, you
should set the fuse “disconnected” or take the
DC fuse out. It will protect the people from the
electricity generated by capacitance.
5.
It’s
better to operate by professional. And you
should connect with the grounding wire to
prevent connecting electricity.

|
No. |
SPEC |
|
1 |
1500W |
|
2 |
2000W |
|
3 |
3000W |
|
4 |
5000W |
|
5 |
10KW |
|
6 |
20KW |
|