This kind of Micro-hydro Generator is
consisted of an inclined impulse turbine
and a set of direct connected AC
single-phase / three-phase generator.
With the characteristics of small body,
lightweight, simple structure, reliable
operation and convenient assembly, and
serving as the power source of lighting,
TVs and recorders, it is most suitable
for the households in mountain areas
with scattered and small hydroelectric
sources. The consumers can do easily
themselves the installation and
operation. This product has been
thoroughly strengthened in the special
technical measures to good quality,
stable function and easy operation for
women and children. Much less investment
may add more happiness to your family.
|
Model |
Power |
Head
(m) |
Rate of flow |
Rotational Speed |
Install tube diameter |
|
(W) |
(m3/s) |
(rpm) |
(mm) |
|
CJ-200W |
200 |
10-14 |
0.003-0.004 |
1500 |
50 |
|
CJ-300W |
300 |
12-14 |
0.003-0.005 |
1500 |
50 |
|
CJ-500W |
500 |
12-18 |
0.005-0.007 |
1500 |
50-75 |
|
CJ-750W |
750 |
14-18 |
0.005-0.008 |
1500 |
75 |
|
CJ-1.1KW |
1000 |
16-22 |
0.008-0.010 |
1500 |
100 |
|
CJD-1.1KW |
1000 |
15 |
0.010-0.015 |
1500 |
125-150 |
|
CJ-1.5KW |
1500 |
18-25 |
0.008-0.011 |
1500 |
125 |
|
CJD-1.5KW |
1500 |
15 |
0.012-0.018 |
1500 |
125-150 |
|
CJ-3KW |
3000 |
25-35 |
0.015-0.019 |
1500 |
125-150 |
|
CJD-3KW |
3000 |
18-20 |
0.018-0.030 |
1500 |
150 |
|
CJ-6KW |
6000 |
28-35 |
0.030-0.038 |
1500 |
150-200 |
|
CJD-6KW |
6000 |
18-20 |
0.038-0.050 |
1000 |
200 |
|
CJ-10KW |
10000 |
30-38 |
0.040-0.050 |
1500 |
200-250 |
|
CJD-10KW |
10000 |
25-30 |
0.050-0.060 |
1000 |
200-250 |
|
CJD-12KW |
12000 |
28-35 |
0.050-0.060 |
1500 |
200-250 |
|
CJD-15KW |
15000 |
30-40 |
0.060-0.070 |
1500/1000 |
200 |
|
CJD-20KW |
20000 |
30-45 |
0.060-0.100 |
1500/1000 |
250-300 |
|
CJD-30KW
|
30000 |
38-45 |
0.090-0.120 |
1500/1000 |
250-300 |
The typical micro hydro generator
station is as follows (figure 1),which
consists of earthwork(inlet conduit
construction,unit room and drain
etc),the micro hydro
generator,electrical wires and the users
wires.

|
01 |
Penstock |
06 |
Inlet Pipe |
11 |
User |
|
02 |
Reservoir |
07 |
Tailrace |
h |
Water head |
|
03 |
Trash rack |
08 |
Power house |
h1 |
Penstock fall |
|
04 |
Fore bay |
09 |
Electric pole |
h2 |
Flood altitude |
|
05 |
Brook |
10 |
Wire |
H |
Reach fall |
The work process is as follows:Collecting
the water of stream by reservior,the
water inflow the pressure poor through
the inlet conduit,the go into th micro
hydro generator which is installed in
the unit room through the inlet
pipeline,force the runner to
circumgyate,which drives the genertator
to generate electricity.At eh same
time,the adjustment machine autoadjust
the voltage and the frequency to meet
the requirements for power supply,and
then the user can use the electricity
transmitted hyelectrical wires.
Operation Method:
1)
Firstly, check whether all components
are completed and the intake of penstock
is blocked.
2) Then check whether the runner of
turbine can be easily rotated, and
rotated in by hand to ensure the voltage
meter has readings (put the output
switch in OFF position).
3)
For the first starting, the output
switch should be put in the
voltage-stabilized control position (A),
then open the gate to let water out from
small to large, observe the readings
meter till 230V (380V) or so continue
enhancing water volume, the voltage
device is reliable if the reading keep
still. At this time the load can be
connected, then adjust the water volume
to hold the output of 230V (380V) or so.
Once the stabilizing device break down,
put the switch in B, then the voltage of
unit will be under manual-controlled,
you may follow the next procedure to
control by valve.
4) During the operation, the load should
be kept stable as possible as can be.
Don't shut off the load suddenly, or
else the high voltage will burn out the
rest load, if you must is connect the
load, you may decrease water to small
volume at first, then disconnect the
most part of load when the voltage has
dropped to below 380v (you must do as
this even you run the unit under the
using of voltage-stabilizing device).
5) It need only close the valve to
switch off the unit when the load has
been stable after first operation, the
power switch may hold on so that you may
adjust voltage up to 230V (380V)
directly for next running.
Maintenance:
1)
To check and clean the mud and foreign
material blocking in the intake house
and trash rack.
2)
The frame of unit should be injected
water-proof grease by using grease cup
in every three month, each time rotating
for three times. The upper bearing also
should be added waterproof grease for
every six months.
3) The generator must be conducted the
dry treatment before next start if it
became wet.

|